Achieving Energy Efficiency at Ted Glasrud Associates with Honeywell JADE Economizers

Ted Glasrud Associates (TGA) is a commercial and residential real estate development and property management firm with a wide variety of properties to manage. Because no two buildings are alike, the company and its maintenance team are continually challenged to optimize HVAC systems across a wide variety of building types.

Read Post

Guidelines for Replacement of Old Fire and Smoke Actuators

For Belimo combination fire/smoke damper actuators intended for installation in accordance with National Protection Association Standard for Installation of Air Conditioning and Ventilating Systems, NFPA 90A, damper actuators must meet the construction and performance requirements in UL555: Standard for Fire Dampers and UL555S: Standard for Smoke Dampers. Often, customers replace damper actuators for varying reasons […]

Read Post

Application Tips: Determining Air Flow in Cubic Ft./ Min

To calculate Air Flow in Cubic Feet per Minute (CFM), determine the Flow Velocity in feet per minute, then multiply this figure by the Duct Cross Sectional Area. Air Flow in CFM (Q) = Flow Velocity in Feet Per Minute (V) x Duct Cross Sectional Area (A)

Read Post

Field Economizer Retrofit Guide

Is your economizer really working? Did you know, according to our market research, that as many as 70% of economizer systems installed may not be functioning at optimum efficiency today? Conditions such as faulty control setting, incorrect wiring, installation, or commissioning, or rusted or jammed air dampers could be restricting the ability to experience “free […]

Read Post

DENT Helps University Claim 6.5 Million Rebate

      When the local electric company said, “turn off your lights,” the University of Washington listened. Seattle City Light recently required the major university to reduce its overall energy consumption, and it offered big rewards for doing so.

Read Post

Panels 101: Designing and Building Control Panels

The most critical element that shapes a panel design project must be addressed at the very beginning of a project: where is the completed unit going to be installed? This very basic question dictates the type of protection the enclosure must provide to the equipment. The switchgear inside the enclosure must be protected from the […]

Read Post

Tech Talk: I need an explosion-proof control panel with a few pilot lights and…

Q: I’ve been buying explosion-proof enclosures and devices from Kele, and I must say that the Hazardous Locations section of your catalog is a gold mine of hard-to-find products! Now I need an explosion-proof control panel with a few pilot lights and externally operable selector switches mounted on the door of the panel. Can Kele help me with […]

Read Post

The Winter Olympics and Data Center Power

Let the games begin! The 2018 Winter games have begun! So far, we have seen some terrific skating, spectacular snowboarding, and intense bobsledding. The games have showcased a great deal of technology, and much of it is driven by cloud resources. To ensure everything is executed on time and lights stay on, a tremendous amount […]

Read Post